Solar EPC, testing & commissioning, PV diagnostics, BESS integration and industrial energy intelligence, delivered with evidence you can audit.
We help project owners, EPC contractors and industrial consumers make better technical decisions, detect defects earlier, validate performance and improve asset reliability throughout the project lifecycle.
01
Safety first
Risk-based work planning and safe execution.
02
Evidence-led
Measurements, records and traceable findings.
03
Specification-driven
Checks against approved documents and applicable standards.
04
Clear reporting
Actionable non-conformance and close-out records.
Seven stages, one accountable framework across solar PV, BESS and the electrical balance-of-system.
Assess
Feasibility & risk
Site, load and technical risk reviewed before capital is committed.
Engineer
Design review
Layouts, SLDs, protection and BOQ checked for constructability.
Procure
Factory quality
Documents, sampling, witness points and FAT before dispatch.
Build
Solar EPC
Installation supervised and inspected at every interface.
Commission
Test & hand over
DC/AC tests, protection checks and a traceable dossier.
Operate
O&M & performance
Data review, root-cause analysis and corrective actions.
Optimize
Energy intelligence
Procurement, tariff and BESS decisions backed by data.
Seven stages, one accountable framework across solar PV, BESS and the electrical balance-of-system.
Integrated support from early technical assessment through installation, commissioning and operational improvement.
Testing depth, sample size and acceptance criteria are agreed before mobilization, against your approved specifications and applicable IS/IEC requirements.
Battery storage adds new interfaces: BMS, PCS, EMS, thermal management and fire safety. We extend quality checks and commissioning coordination to these systems, aligned with OEM procedures, system architecture and site safety requirements.
- 01Battery racks, containers, DC busbars, cabling, isolation and labelling
- 02BMS signals, alarms, interlocks and communications checks
- 03PCS functional tests for grid-following or grid-forming configurations, as designed
- 04HVAC and thermal management; temperature monitoring and alarm response review
- 05Fire detection and suppression interface, emergency-stop logic
- 06EMS, SCADA, PLC, metering and communication mapping
BESS testing and commissioning follows OEM procedures, project-specific safety plans and competent-person requirements. Ventorix does not act as a statutory inspector, accredited laboratory or product certifier.
Energy Trading and Risk Management brings procurement, contracts, market analytics, risk controls, scheduling and settlement together. Ventorix starts where it matters for a factory: understanding what power really costs, and what to do about it.
Ventorix EnergyOS
In development
An industrial energy-intelligence platform with 7 layers, from meter and SCADA data to CFO dashboards, with forecasting, risk and BESS optimization in between.
Every engagement follows the same traceable sequence, whether it is a factory witness test or a full commissioning assignment.
- 01
Scope & document review
Confirm assets, specifications, drawings, acceptance criteria and responsibilities.
01/06 - 02
Inspection & test planning
Prepare a risk-based ITP, method statements, safety controls and required instruments.
02/06 - 03
Field or factory execution
Conduct agreed inspections, tests, sampling, witness points and evidence capture.
03/06 - 04
Findings & NCRs
Record deviations, classify risk and issue clear corrective-action requirements.
04/06 - 05
Verification & close-out
Review corrective actions, repeat agreed tests and update punch lists.
05/06 - 06
Final report & handover
Deliver traceable reports, an outstanding-item register and recommendations.
06/06
Every finding is recorded, classified and closed out, with measurements traceable to instruments, dates and acceptance criteria.
Scope of work & ITP
Defines assets, inspection points, criteria and responsibilities.
Checklists & test sheets
Observed condition, measurements, instrument details and results.
NCR & corrective action log
Deviation, severity, action owner, due date and closure.
Photo & thermal evidence
Supports traceability and investigation of observed issues.
Commissioning dossier
Approved test records, punch-list status and handover documents.
Final technical report
Findings, limitations, risks and recommended actions.