When a factory compares power options, the most visible number is usually an exchange price or a trader's quote. It is also the most misleading number if it is read on its own.
What a plant actually pays, its landed cost, includes the charges and losses that apply between the point of purchase and the meter, plus the cost of managing the arrangement.
What sits between the quote and the bill
Depending on the route and the applicable orders, a landed-cost comparison typically has to account for:
- Transmission and wheeling charges
- Applicable losses
- Cross-subsidy and additional surcharges where they apply
- Scheduling, deviation and administrative fees
- Taxes and duties
- The demand and contract-demand implications for your existing DISCOM connection
Why it changes
CSERC regulations, amendments, tariff orders and open-access charges change over time. The CSERC (Intra-State Open Access in Chhattisgarh) (Second Amendment) Regulations, 2023, for example, provide that the cross-subsidy surcharge for open-access consumers should not exceed 20% of the average cost of supply.
A comparison built on last year's charges can point a buyer in the wrong direction, so every proposal should be checked against the current applicable orders, eligibility, scheduling and settlement requirements.
Start with the baseline
The most reliable starting point is twelve months of bills, interval load data, contract demand and power factor. From there, DISCOM, open-access, captive and renewable options can be compared on the same landed basis, with the assumptions written down.
Savings claims should always be measured against that documented baseline, net of fees and of every cost needed to achieve them, and without double counting solar, BESS, demand-reduction and procurement effects.