Rooftop and ground-mounted solar for residential, commercial, industrial and utility applications, with installation quality built in.

Lifecycle stage · Build
[02] Overview

We deliver and supervise rooftop and ground-mounted solar systems, checking installation quality at every interface from module clamps to earthing, and coordinate a clean handover.

What's included

  • 01Rooftop and ground-mounted systems for residential, C&I and utility applications
  • 02Installation checks for modules, mounting structures, DC/AC cabling and inverters
  • 03Earthing, lightning protection and balance-of-system inspection
  • 04Project supervision, site inspection and handover coordination
Scope

01

Execution

Rooftop and ground-mount delivery planned around safety, sequencing and the approved design.

02

Installation QA

Modules, structures, cabling, inverters and earthing inspected against drawings and manufacturer requirements.

03

Handover

Punch lists closed, records compiled and the asset handed over with traceable documentation.

Typical deliverables

Installation checklists
Site inspection reports
Punch list
Handover documentation
Methodology

  1. 01

    Scope & document review

    Confirm assets, specifications, drawings, acceptance criteria and responsibilities.

  2. 02

    Inspection & test planning

    Prepare a risk-based ITP, method statements, safety controls and required instruments.

  3. 03

    Field or factory execution

    Conduct agreed inspections, tests, sampling, witness points and evidence capture.

  4. 04

    Findings & NCRs

    Record deviations, classify risk and issue clear corrective-action requirements.

  5. 05

    Verification & close-out

    Review corrective actions, repeat agreed tests and update punch lists.

  6. 06

    Final report & handover

    Deliver traceable reports, an outstanding-item register and recommendations.