Inspect

From early technical assessment through installation, commissioning and operational improvement: eight service lines delivered within one specification-led framework.

02Build

Solar EPC & Installation Support

Rooftop and ground-mounted solar for residential, commercial, industrial and utility applications, with installation quality built in.

Explore
03Commission

Testing & Commissioning

Pre-commissioning inspection, DC/AC testing, inverter and protection validation, grid-sync readiness and the commissioning dossier.

Explore
04Validate

Solar PV Inspection & Diagnostics

IV-curve testing, electroluminescence, drone thermography, electrical safety checks and performance validation.

Explore
05Procure

Procurement Quality & Factory Inspection

Datasheet and certificate review, serial traceability, sampling, witness points and FAT coordination for major equipment.

Explore
Engagement models

Each model can stand alone or combine with others as the project moves from procurement to operation.

01

Pre-dispatch / factory inspection

Equipment document review, agreed sampling and witness testing.

02

Pre-commissioning & commissioning

Site testing, punch list and handover documentation.

03

Independent quality assurance

Inspection plans, site quality surveillance and NCR management.

04

Specialist diagnostics

IV-curve, EL coordination, thermography and targeted fault investigation.

05

BESS & electrical systems review

Interface checks, FAT/SAT coordination and commissioning support.

06

Performance audit & O&M support

Recurring inspections, data review and improvement plans.

07

Engineering & procurement advisory

Technical specification, BOQ/BOM and OEM offer evaluation.

[02]Typical deliverables

Every finding is recorded, classified and closed out, with measurements traceable to instruments, dates and acceptance criteria.

ITPDOC-01

Scope of work & ITP

Defines assets, inspection points, criteria and responsibilities.

CHKDOC-02

Checklists & test sheets

Observed condition, measurements, instrument details and results.

NCRDOC-03

NCR & corrective action log

Deviation, severity, action owner, due date and closure.

IMGDOC-04

Photo & thermal evidence

Supports traceability and investigation of observed issues.

DOSDOC-05

Commissioning dossier

Approved test records, punch-list status and handover documents.

RPTDOC-06

Final technical report

Findings, limitations, risks and recommended actions.