Inspect

Pre-commissioning inspection, DC/AC testing, inverter and protection validation, grid-sync readiness and the commissioning dossier.

Lifecycle stage · Commission
[03] Overview

Commissioning is where design intent meets measured reality. We verify documents, run agreed DC and AC tests, validate protection and inverter functions, and assemble a dossier that stands up to scrutiny.

What's included

  • 01Pre-commissioning inspection and document verification
  • 02DC and AC tests, inverter functional validation and protection-system checks
  • 03Grid-synchronization readiness review
  • 04Punch-list management, test records and commissioning dossier
  • 05Handover support to the owner or O&M team
Scope

01

Pre-commissioning

Documents, drawings and installed condition verified before energization.

02

Functional testing

DC/AC measurements, inverter functions and protection interfaces tested and recorded.

03

Dossier

Approved test records, punch-list status and handover documents in one traceable package.

Typical deliverables

Test sheets & records
Punch list
Commissioning dossier
Handover pack
Methodology

  1. 01

    Scope & document review

    Confirm assets, specifications, drawings, acceptance criteria and responsibilities.

  2. 02

    Inspection & test planning

    Prepare a risk-based ITP, method statements, safety controls and required instruments.

  3. 03

    Field or factory execution

    Conduct agreed inspections, tests, sampling, witness points and evidence capture.

  4. 04

    Findings & NCRs

    Record deviations, classify risk and issue clear corrective-action requirements.

  5. 05

    Verification & close-out

    Review corrective actions, repeat agreed tests and update punch lists.

  6. 06

    Final report & handover

    Deliver traceable reports, an outstanding-item register and recommendations.